12 bay Modular NHS Mental Health Facility
First of its generation and a prototype as a mental health “drop in centre”
External cedral cladding & brick slip was actually installed onsite (normally in the factory). The canopy was also installed osnite by Acrol, with Full heating and ventilations systems by Acrol Air
Included also IAP/FAP, Door access, Staff attack system
The contract was with Sir Robert Mcalpine