<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects &#8211; Acrol Modular Buildings</title>
	<atom:link href="https://buildingsmodular.co.uk/projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://buildingsmodular.co.uk</link>
	<description></description>
	<lastBuildDate>Mon, 15 Dec 2025 15:27:37 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.3</generator>
	<item>
		<title>5no &#038; 3no. Bay Modular Nursery &#8211; (Killingworth)</title>
		<link>https://buildingsmodular.co.uk/projects/5no-3no-bay-modular-nursery-killingworth/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=5no-3no-bay-modular-nursery-killingworth</link>
					<comments>https://buildingsmodular.co.uk/projects/5no-3no-bay-modular-nursery-killingworth/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 15:27:20 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4300</guid>

					<description><![CDATA[<p>5 no &#38; 3 no Modular Nursery Location: Killingworth, Newcastle The 5 no Bay Modular was their own existing unit,...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5no-3no-bay-modular-nursery-killingworth/">5no &#038; 3no. Bay Modular Nursery &#8211; (Killingworth)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>5 no &amp; 3 no Modular Nursery</p>
<p>Location: Killingworth, Newcastle</p>
<p>The 5 no Bay Modular was their own existing unit, where we had to remove from another school site and into our Gateshead factory where it was refurbished (only internally). The new build was manufactured there also and they were eventually both installed on the same site as two separate buildings.</p>
<p>Acrol Modular acted as Main contractor for a Full Turnkey project, including Groundworks &amp; Foundation by GB Civils (including Fencing &amp; gates), Full M&amp;E spec with Air con by Acrol Air conditioning, Door access, FAP &amp; IAP Alarms by Crusader. Transport by SF Haulage and Crane by Bryan Thomas. All other works by Acrol Modular</p>
<p>Installed by the Acrol modular team &#8211; During 2025</p>
<p><img fetchpriority="high" decoding="async" class="alignnone size-medium wp-image-4301" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day-600x338.png" alt="" width="600" height="338" title="Projects 18" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day-600x338.png 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day-1024x576.png 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day-768x432.png 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day-1536x864.png 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/1_Day.png 1920w" sizes="(max-width: 600px) 100vw, 600px" /> <img decoding="async" class="alignnone size-medium wp-image-4302" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002-600x338.png" alt="" width="600" height="338" title="Projects 19" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002-600x338.png 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002-1024x576.png 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002-768x432.png 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002-1536x864.png 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_002.png 1920w" sizes="(max-width: 600px) 100vw, 600px" /> <img decoding="async" class="alignnone size-medium wp-image-4303" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003-600x338.png" alt="" width="600" height="338" title="Projects 20" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003-600x338.png 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003-1024x576.png 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003-768x432.png 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003-1536x864.png 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_003.png 1920w" sizes="(max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4304" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004-600x338.png" alt="" width="600" height="338" title="Projects 21" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004-600x338.png 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004-1024x576.png 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004-768x432.png 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004-1536x864.png 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_004.png 1920w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4305" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006-600x338.png" alt="" width="600" height="338" title="Projects 22" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006-600x338.png 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006-1024x576.png 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006-768x432.png 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006-1536x864.png 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/4_Day_006.png 1920w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4306" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-600x450.jpg" alt="" width="600" height="450" title="Projects 23" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7792-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4307" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-600x450.jpg" alt="" width="600" height="450" title="Projects 24" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7793-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4308" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-600x450.jpg" alt="" width="600" height="450" title="Projects 25" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7806-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4309" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-450x600.jpg" alt="" width="344" height="459" title="Projects 26" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7825-scaled.jpg 1920w" sizes="auto, (max-width: 344px) 100vw, 344px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4310" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-600x450.jpg" alt="" width="600" height="450" title="Projects 27" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7826-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4311" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-600x450.jpg" alt="" width="600" height="450" title="Projects 28" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7878-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4312" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-600x450.jpg" alt="" width="600" height="450" title="Projects 29" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7791-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4315" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-600x450.jpg" alt="" width="600" height="450" title="Projects 30" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7805-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4316" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-450x600.jpg" alt="" width="337" height="449" title="Projects 31" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7823-scaled.jpg 1920w" sizes="auto, (max-width: 337px) 100vw, 337px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4317" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-450x600.jpg" alt="" width="339" height="452" title="Projects 32" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7824-scaled.jpg 1920w" sizes="auto, (max-width: 339px) 100vw, 339px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4318" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-600x450.jpg" alt="" width="600" height="450" title="Projects 33" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7876-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4319" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-600x450.jpg" alt="" width="600" height="450" title="Projects 34" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_7877-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5no-3no-bay-modular-nursery-killingworth/">5no &#038; 3no. Bay Modular Nursery &#8211; (Killingworth)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/5no-3no-bay-modular-nursery-killingworth/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>1 Bay Security Gatehouse (Peterborough)</title>
		<link>https://buildingsmodular.co.uk/projects/1-bay-security-gatehouse-peterborough/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=1-bay-security-gatehouse-peterborough</link>
					<comments>https://buildingsmodular.co.uk/projects/1-bay-security-gatehouse-peterborough/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 15:13:26 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4292</guid>

					<description><![CDATA[<p>1 Bay Modular Security Gatehouse Location: Peterborough Full M&#38;E spec, including Air Con, by Acrol Air Conditioning External was Micro...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/1-bay-security-gatehouse-peterborough/">1 Bay Security Gatehouse (Peterborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>1 Bay Modular Security Gatehouse</p>
<p>Location: Peterborough</p>
<p>Full M&amp;E spec, including Air Con, by Acrol Air Conditioning</p>
<p>External was Micro Rib cladding, Isoclad (North Shields) and transported &amp; installed via Hi-ab, by SF Haulage</p>
<p>Installed by the Acrol Modular team, during 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4297" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-600x450.jpg" alt="" width="600" height="450" title="Projects 41" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155934-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4298" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-450x600.jpg" alt="" width="335" height="447" title="Projects 42" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155948-scaled.jpg 1920w" sizes="auto, (max-width: 335px) 100vw, 335px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4296" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-600x450.jpg" alt="" width="600" height="450" title="Projects 43" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155917-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4295" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-600x450.jpg" alt="" width="600" height="450" title="Projects 44" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_155908-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4294" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-600x450.jpg" alt="" width="600" height="450" title="Projects 45" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120103-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4293" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-600x450.jpg" alt="" width="600" height="450" title="Projects 46" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250520_120056-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&nbsp;</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/1-bay-security-gatehouse-peterborough/">1 Bay Security Gatehouse (Peterborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/1-bay-security-gatehouse-peterborough/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 no Bay Modular Classroom (Byker-Northeast)</title>
		<link>https://buildingsmodular.co.uk/projects/2-no-bay-modular-classroom-byker-northeast/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-no-bay-modular-classroom-byker-northeast</link>
					<comments>https://buildingsmodular.co.uk/projects/2-no-bay-modular-classroom-byker-northeast/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 15:07:54 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4284</guid>

					<description><![CDATA[<p>2 no Bay Modular Classroom Location: Byker, Newcastle Full M&#38; Spec, with Air Con by Acrol Air Conditioning, internal sliding...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-bay-modular-classroom-byker-northeast/">2 no Bay Modular Classroom (Byker-Northeast)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 no Bay Modular Classroom</p>
<p>Location: Byker, Newcastle</p>
<p>Full M&amp; Spec, with Air Con by Acrol Air Conditioning, internal sliding &amp; bi folding wall.</p>
<p>The unit was 60min fire rated without, with an external Cedral cladding. The unit was located in small courtyard and crane (by Bryan Thomas) over other buildings over a weekend.</p>
<p>Transport by SF Haulage</p>
<p>Installed by Acrol Modular team during 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4285" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-600x450.jpg" alt="" width="600" height="450" title="Projects 52" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_090317-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4286" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-450x600.jpg" alt="" width="334" height="445" title="Projects 53" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_093231-scaled.jpg 1920w" sizes="auto, (max-width: 334px) 100vw, 334px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4287" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-600x450.jpg" alt="" width="600" height="450" title="Projects 54" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_100142-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4288" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-600x450.jpg" alt="" width="600" height="450" title="Projects 55" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250426_104910-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4289" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250728-WA0001-450x600.jpg" alt="" width="450" height="600" title="Projects 56" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250728-WA0001-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250728-WA0001-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250728-WA0001-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250728-WA0001.jpg 1200w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-bay-modular-classroom-byker-northeast/">2 no Bay Modular Classroom (Byker-Northeast)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/2-no-bay-modular-classroom-byker-northeast/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>5 no Medical Cabins (Cheshire)</title>
		<link>https://buildingsmodular.co.uk/projects/5-no-medical-cabins-cheshire/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=5-no-medical-cabins-cheshire</link>
					<comments>https://buildingsmodular.co.uk/projects/5-no-medical-cabins-cheshire/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 15:00:10 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4275</guid>

					<description><![CDATA[<p>5 no Medical Cabins for the RSPCA (3 no shown, but 2 no in another location, not accessible to the...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5-no-medical-cabins-cheshire/">5 no Medical Cabins (Cheshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>5 no Medical Cabins for the RSPCA (3 no shown, but 2 no in another location, not accessible to the public)</p>
<p>Location: Cheshire</p>
<p>Internally included full Altro whiterock walls and ceiling cladding, HTM wall Ventilation, Stainless steel sinks and mist cleaning system</p>
<p>Transport &amp; Hi-Ab install by SF Haulage.</p>
<p>Installed by the Acrol Modular Team &#8211; during 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4276" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-600x450.jpg" alt="" width="600" height="450" title="Projects 63" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132516-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4277" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-450x600.jpg" alt="" width="450" height="600" title="Projects 64" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132529-scaled.jpg 1920w" sizes="auto, (max-width: 450px) 100vw, 450px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4278" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-600x450.jpg" alt="" width="600" height="450" title="Projects 65" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132553-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4279" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-600x450.jpg" alt="" width="600" height="450" title="Projects 66" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_132610-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4280" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-600x450.jpg" alt="" width="600" height="450" title="Projects 67" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135637-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4281" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-600x450.jpg" alt="" width="600" height="450" title="Projects 68" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250320_135648-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5-no-medical-cabins-cheshire/">5 no Medical Cabins (Cheshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/5-no-medical-cabins-cheshire/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 no. 40ft Stacked Cabins (Blaydon-Northeast)</title>
		<link>https://buildingsmodular.co.uk/projects/2-no-40ft-stacked-cabins-blaydon-northeast/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-no-40ft-stacked-cabins-blaydon-northeast</link>
					<comments>https://buildingsmodular.co.uk/projects/2-no-40ft-stacked-cabins-blaydon-northeast/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 14:51:39 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4266</guid>

					<description><![CDATA[<p>2 no 40ft x 12ft Office and Welfare cabins  &#8211; Stacked Location: Blaydon, Tyne &#38; Wear Full M&#38;E internally including...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-40ft-stacked-cabins-blaydon-northeast/">2 no. 40ft Stacked Cabins (Blaydon-Northeast)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 no 40ft x 12ft Office and Welfare cabins  &#8211; Stacked</p>
<p>Location: Blaydon, Tyne &amp; Wear</p>
<p>Full M&amp;E internally including Air Con, by Acrol Air Conditioning</p>
<p>The end Client used their own transport &amp; Hi-ab teams via a tandem lift, but we used our own Acrol team to install the units</p>
<p>External staircase via the end user</p>
<p>Installed during 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4267" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-600x450.jpg" alt="" width="600" height="450" title="Projects 74" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_130009-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4268" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-600x450.jpg" alt="" width="600" height="450" title="Projects 75" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_133654-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4269" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-600x450.jpg" alt="" width="600" height="450" title="Projects 76" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20250411_140609-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4270" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0001-450x600.jpg" alt="" width="450" height="600" title="Projects 77" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0001-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0001-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0001-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0001.jpg 1200w" sizes="auto, (max-width: 450px) 100vw, 450px" />  <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4272" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0005-450x600.jpg" alt="" width="450" height="600" title="Projects 78" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0005-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0005-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0005-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG-20250703-WA0005.jpg 1200w" sizes="auto, (max-width: 450px) 100vw, 450px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-40ft-stacked-cabins-blaydon-northeast/">2 no. 40ft Stacked Cabins (Blaydon-Northeast)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/2-no-40ft-stacked-cabins-blaydon-northeast/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>4 no. Bay MOJ Modular Training Facility (Stockton)</title>
		<link>https://buildingsmodular.co.uk/projects/4-no-bay-moj-modular-training-facility-stockton/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=4-no-bay-moj-modular-training-facility-stockton</link>
					<comments>https://buildingsmodular.co.uk/projects/4-no-bay-moj-modular-training-facility-stockton/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 14:46:01 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4255</guid>

					<description><![CDATA[<p>4 no Bay Modular Training Unit Location: HMYOI Holmes House, Stockton Inhouse training facility manufactured to part MOJ standards Brickslip...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/4-no-bay-moj-modular-training-facility-stockton/">4 no. Bay MOJ Modular Training Facility (Stockton)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>4 no Bay Modular Training Unit</p>
<p>Location: HMYOI Holmes House, Stockton</p>
<p>Inhouse training facility manufactured to part MOJ standards</p>
<p>Brickslip was completed in the factory, with Air Conditioning by Acrol Air Conditioning Company</p>
<p>Full M&amp;E Spec, including SR2 Main doors, plus suspended ceilings</p>
<p>Installed by the Acrol Modular installation team &#8211; 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4256" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-600x450.jpg" alt="" width="600" height="450" title="Projects 88" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45011-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4257" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-600x450.jpg" alt="" width="600" height="450" title="Projects 89" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45291-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4258" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-600x450.jpg" alt="" width="600" height="450" title="Projects 90" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45561-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4259" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-600x450.jpg" alt="" width="600" height="450" title="Projects 91" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_45581-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4260" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-600x450.jpg" alt="" width="600" height="450" title="Projects 92" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_48461-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4261" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-600x450.jpg" alt="" width="600" height="450" title="Projects 93" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49121-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4262" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-600x450.jpg" alt="" width="600" height="450" title="Projects 94" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49141-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4263" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-600x450.jpg" alt="" width="600" height="450" title="Projects 95" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49191-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4264" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-600x450.jpg" alt="" width="600" height="450" title="Projects 96" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/IMG_49201-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&nbsp;</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/4-no-bay-moj-modular-training-facility-stockton/">4 no. Bay MOJ Modular Training Facility (Stockton)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/4-no-bay-moj-modular-training-facility-stockton/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 no. Hire Cabins (Loughborough)</title>
		<link>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-no-hire-cabins-loughborough-2</link>
					<comments>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough-2/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 14:37:53 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4247</guid>

					<description><![CDATA[<p>2 no. Cabins, both on Long-term Hire (1 no 44ft Office &#38; 1 no 32ft Welfare) Location: Loughborough 13.2m (L)...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough-2/">2 no. Hire Cabins (Loughborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 no. Cabins, both on <strong>Long-term Hire</strong></p>
<p>(1 no 44ft Office &amp; 1 no 32ft Welfare)</p>
<p>Location: Loughborough</p>
<p>13.2m (L) x 4.2m (W)  and has a full steel welded chassis.</p>
<p>Installed by the Acrol team, including vermin skirt &#8211; installed 2025</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4248" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-600x450.jpg" alt="" width="600" height="450" title="Projects 102" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_104633-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4249" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-600x450.jpg" alt="" width="600" height="450" title="Projects 103" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191754-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4250" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-600x450.jpg" alt="" width="600" height="450" title="Projects 104" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191759-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4251" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-600x450.jpg" alt="" width="600" height="450" title="Projects 105" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191839-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4252" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-600x450.jpg" alt="" width="600" height="450" title="Projects 106" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240927_191913-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&nbsp;</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough-2/">2 no. Hire Cabins (Loughborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough-2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 no Hire Cabins (Loughborough)</title>
		<link>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-no-hire-cabins-loughborough</link>
					<comments>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 15 Dec 2025 14:27:44 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4241</guid>

					<description><![CDATA[<p>2 no. Linked 9.6m cabins (Offices &#38; Welfare) &#8211; Long-term Hire units Located: Loughborough Standard Modular Units, with Goosewing Grey...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough/">2 no Hire Cabins (Loughborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 no. Linked 9.6m cabins (Offices &amp; Welfare) &#8211; <strong>Long-term Hire units</strong></p>
<p>Located: Loughborough</p>
<p>Standard Modular Units, with Goosewing Grey cladding</p>
<p>Installed by the Acrol Modular Team and Supported by WS Transport with their own Hi-abs &#8211; Installed 2025.</p>
<p>Steps provided by Easiaccess</p>
<p>Located next to another set of Acrol Linked 9.6m Hire cabins, which were installed in 2024</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4242" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-600x450.jpg" alt="" width="600" height="450" title="Projects 111" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_103047-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4243" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-600x450.jpg" alt="" width="600" height="450" title="Projects 112" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_125517-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4244" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-600x450.jpg" alt="" width="600" height="450" title="Projects 113" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184851-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4245" src="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-600x450.jpg" alt="" width="600" height="450" title="Projects 114" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2025/12/20240924_184858-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough/">2 no Hire Cabins (Loughborough)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/2-no-hire-cabins-loughborough/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 &#038; 3 Bay Modular Classrooms (Cheselbourne, Dorset)</title>
		<link>https://buildingsmodular.co.uk/projects/2-3-bay-modular-classrooms-cheselbourne-dorset/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-3-bay-modular-classrooms-cheselbourne-dorset</link>
					<comments>https://buildingsmodular.co.uk/projects/2-3-bay-modular-classrooms-cheselbourne-dorset/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 29 Aug 2024 10:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4121</guid>

					<description><![CDATA[<p>2 &#38; 3 Bay Modular Classrooms Located: Cheselbourne, Dorset Full M&#38;E specifications, including heating &#38; cooling via Acrol Air conditioning....</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-3-bay-modular-classrooms-cheselbourne-dorset/">2 &#038; 3 Bay Modular Classrooms (Cheselbourne, Dorset)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 &amp; 3 Bay Modular Classrooms</p>
<p>Located: Cheselbourne, Dorset</p>
<p>Full M&amp;E specifications, including heating &amp; cooling via Acrol Air conditioning. Spec included Fire alarm system and acoustic panelling to the ceilings</p>
<p>Both buildings fully cladding externally with thermowood, but full fire rated onsite with fire rated protection</p>
<p>Installation, by the Acrol installation teams</p>
<p>Installed summer 2024</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4214" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-600x450.jpg" alt="" width="600" height="450" title="Projects 120" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_114853-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4215" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-450x600.jpg" alt="" width="340" height="453" title="Projects 121" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_124652-scaled.jpg 1920w" sizes="auto, (max-width: 340px) 100vw, 340px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4216" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-600x450.jpg" alt="" width="600" height="450" title="Projects 122" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153231-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4217" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-600x450.jpg" alt="" width="600" height="450" title="Projects 123" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240813_153236-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4218" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-600x450.jpg" alt="" width="600" height="450" title="Projects 124" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240815_132032-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&nbsp;</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/2-3-bay-modular-classrooms-cheselbourne-dorset/">2 &#038; 3 Bay Modular Classrooms (Cheselbourne, Dorset)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/2-3-bay-modular-classrooms-cheselbourne-dorset/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>4 Bay Modular Classroom (Lifton, Devon)</title>
		<link>https://buildingsmodular.co.uk/projects/4-bay-modular-classroom-lifton-devon/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=4-bay-modular-classroom-lifton-devon</link>
					<comments>https://buildingsmodular.co.uk/projects/4-bay-modular-classroom-lifton-devon/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 29 Aug 2024 10:34:22 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4118</guid>

					<description><![CDATA[<p>bay Modular Classroom with WC facilities Location: Lifton, Devon Full M&#38;E installations, including Heating &#38; cooling via Acrol Air Conditioning...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/4-bay-modular-classroom-lifton-devon/">4 Bay Modular Classroom (Lifton, Devon)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>bay Modular Classroom with WC facilities</p>
<p>Location: Lifton, Devon</p>
<p>Full M&amp;E installations, including Heating &amp; cooling via Acrol Air Conditioning</p>
<p>Installed during Summer 2024, by the Acrol installation team</p>
<p><img loading="lazy" decoding="async" class="alignnone wp-image-4221" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-450x600.jpg" alt="" width="335" height="447" title="Projects 130" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_150803-scaled.jpg 1920w" sizes="auto, (max-width: 335px) 100vw, 335px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4222" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-600x450.jpg" alt="" width="600" height="450" title="Projects 131" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154610-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4223" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-450x600.jpg" alt="" width="336" height="448" title="Projects 132" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-450x600.jpg 450w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-768x1024.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-1152x1536.jpg 1152w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-1536x2048.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_154731-scaled.jpg 1920w" sizes="auto, (max-width: 336px) 100vw, 336px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4224" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-600x450.jpg" alt="" width="600" height="450" title="Projects 133" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_160932-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /> <img loading="lazy" decoding="async" class="alignnone size-medium wp-image-4225" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-600x450.jpg" alt="" width="600" height="450" title="Projects 134" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240831_164942-2048x1536.jpg 2048w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/4-bay-modular-classroom-lifton-devon/">4 Bay Modular Classroom (Lifton, Devon)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/4-bay-modular-classroom-lifton-devon/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>12 bay Modular Classrooms (Bedfordshire)</title>
		<link>https://buildingsmodular.co.uk/projects/12-bay-modular-classrooms-bedfordshire/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=12-bay-modular-classrooms-bedfordshire</link>
					<comments>https://buildingsmodular.co.uk/projects/12-bay-modular-classrooms-bedfordshire/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 29 Aug 2024 10:31:26 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4116</guid>

					<description><![CDATA[<p>12 Bay Modular Classrooms (6 no.) located in Bedfordshire Permanent Education facility, where we completed the shell and internal partitions...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/12-bay-modular-classrooms-bedfordshire/">12 bay Modular Classrooms (Bedfordshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>12 Bay Modular Classrooms (6 no.) located in Bedfordshire</p>
<p>Permanent Education facility, where we completed the shell and internal partitions doors etc. M&amp;E installations by Others, including final finishes such as suspended ceilings and floor finishes.</p>
<p>Installed during Summer 2024</p>
<p><img loading="lazy" decoding="async" class="alignnone wp-image-4228" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-600x450.jpg" alt="" width="427" height="320" title="Projects 140" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG_7349-2048x1536.jpg 2048w" sizes="auto, (max-width: 427px) 100vw, 427px" />  <img loading="lazy" decoding="async" class="alignnone wp-image-4230" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004-600x450.jpg" alt="" width="443" height="332" title="Projects 141" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0004.jpg 1600w" sizes="auto, (max-width: 443px) 100vw, 443px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4231" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005-600x450.jpg" alt="" width="419" height="314" title="Projects 142" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0005.jpg 1600w" sizes="auto, (max-width: 419px) 100vw, 419px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4232" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009-600x450.jpg" alt="" width="420" height="315" title="Projects 143" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0009.jpg 1600w" sizes="auto, (max-width: 420px) 100vw, 420px" />  <img loading="lazy" decoding="async" class="alignnone wp-image-4234" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014-600x450.jpg" alt="" width="422" height="316" title="Projects 144" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/IMG-20240916-WA0014.jpg 1600w" sizes="auto, (max-width: 422px) 100vw, 422px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/12-bay-modular-classrooms-bedfordshire/">12 bay Modular Classrooms (Bedfordshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/12-bay-modular-classrooms-bedfordshire/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>5 Bay Modular Classroom (Eastbourne)</title>
		<link>https://buildingsmodular.co.uk/projects/5-bay-modular-classroom-eastbourne/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=5-bay-modular-classroom-eastbourne</link>
					<comments>https://buildingsmodular.co.uk/projects/5-bay-modular-classroom-eastbourne/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 29 Aug 2024 10:27:58 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=4113</guid>

					<description><![CDATA[<p>5 Bay Modular Classroom (Eastbourne) Permanent Education building, with full M&#38;E Specification, including full ventilation systems via Acrol Air Conditioning...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5-bay-modular-classroom-eastbourne/">5 Bay Modular Classroom (Eastbourne)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>5 Bay Modular Classroom (Eastbourne)</p>
<p>Permanent Education building, with full M&amp;E Specification, including full ventilation systems via Acrol Air Conditioning</p>
<p>Installed During Summer 2024</p>
<p><img loading="lazy" decoding="async" class="alignnone wp-image-4237" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-600x450.jpg" alt="" width="501" height="376" title="Projects 148" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131801-2048x1536.jpg 2048w" sizes="auto, (max-width: 501px) 100vw, 501px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4238" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-600x450.jpg" alt="" width="498" height="373" title="Projects 149" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240806_131829-2048x1536.jpg 2048w" sizes="auto, (max-width: 498px) 100vw, 498px" /> <img loading="lazy" decoding="async" class="alignnone wp-image-4239" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-600x450.jpg" alt="" width="503" height="377" title="Projects 150" srcset="https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-600x450.jpg 600w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-1024x768.jpg 1024w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-768x576.jpg 768w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-1536x1152.jpg 1536w, https://buildingsmodular.co.uk/wp-content/uploads/2024/08/20240812_131830-2048x1536.jpg 2048w" sizes="auto, (max-width: 503px) 100vw, 503px" /></p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/5-bay-modular-classroom-eastbourne/">5 Bay Modular Classroom (Eastbourne)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/5-bay-modular-classroom-eastbourne/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Modular Gatehouse (Goole)</title>
		<link>https://buildingsmodular.co.uk/projects/gatehouse-single-bay-goole/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=gatehouse-single-bay-goole</link>
					<comments>https://buildingsmodular.co.uk/projects/gatehouse-single-bay-goole/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 29 Jul 2024 12:56:02 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3918</guid>

					<description><![CDATA[<p>Single Bay Modular Gatehouse, located in Goole (Yara) 4.4m wide the biggest we have done in that size and at...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/gatehouse-single-bay-goole/">Modular Gatehouse (Goole)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>Single Bay Modular Gatehouse, located in Goole (Yara)</p>
<p>4.4m wide the biggest we have done in that size and at 4.1m high, unique reverse inward return rear overhang</p>
<p>WCs, Kitchens included, with ISOCLAD External PIR cladding and windows &amp; Glazing by CB Solutions</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0027.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0027.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular inside" title="Projects 151"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0026.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0026.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehouse inside" title="Projects 152"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0025.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0025.jpg" class="attachment-thumbnail size-thumbnail" alt="Gatehouse Kitchen" title="Projects 153"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0024.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0024.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehosue Kitchen &amp; Air Con" title="Projects 154"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0022.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0022.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehosue WC" title="Projects 155"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0021.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0021.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular gatehouse Wc &amp; Hand dryer" title="Projects 156"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0020.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0020.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehosue Kitchen" title="Projects 157"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164634.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164634.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular gatehosue Entrance door" title="Projects 158"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164614.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164614.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehouse rear picture" title="Projects 159"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_110954.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_110954.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular gatehouse prior to vermin skirt install" title="Projects 160"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_111005.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_111005.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehsouse, prior to vermin skirt install" title="Projects 161"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_130114.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_130114.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehouse rear elevation with Air Con" title="Projects 162"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164508.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164508.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular gatehouse rear Elevation" title="Projects 163"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164519.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164519.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular gatehouse side elevation" title="Projects 164"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164545.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240726_164545.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Gatehouse Front elevation" title="Projects 165"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/gatehouse-single-bay-goole/">Modular Gatehouse (Goole)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/gatehouse-single-bay-goole/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>44ft Portable Training Cabin (Washington, Tyne &#038; Wear)</title>
		<link>https://buildingsmodular.co.uk/projects/neas-44ft-training-cabin/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=neas-44ft-training-cabin</link>
					<comments>https://buildingsmodular.co.uk/projects/neas-44ft-training-cabin/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Mon, 29 Jul 2024 12:47:05 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3894</guid>

					<description><![CDATA[<p>44ft x 12ft training portable jack leg Cabin, with welfare facilities  including Kitchen (with tea point) and 2 no unisex...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/neas-44ft-training-cabin/">44ft Portable Training Cabin (Washington, Tyne &#038; Wear)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>44ft x 12ft training portable jack leg Cabin, with welfare facilities  including Kitchen (with tea point) and 2 no unisex WCs</p>
<p>Located in Washington, Tyne &amp; Wear</p>
<p>Acrol Modular own manufactured Slatted bench seating installed.</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0017.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0017.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 166"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0016.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0016.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 167"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0015.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0015.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 168"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0014.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0014.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 169"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0013.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0013.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 170"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0012.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0012.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 171"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0011.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0011.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 172"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0010.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0010.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 173"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0009.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0009.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 174"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0000.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0000.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 175"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0001.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0001.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 176"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0002.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0002.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 177"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0004.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0004.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 178"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0005.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0005.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 179"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0006.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0006.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 180"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0007.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0007.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 181"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0008.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20240725-WA0008.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 182"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102956.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102956.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 183"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102906.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102906.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 184"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102842.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102842.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 185"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102749.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240729_102749.jpg" class="attachment-thumbnail size-thumbnail" alt="44ft Jack Leg Cabin" title="Projects 186"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/neas-44ft-training-cabin/">44ft Portable Training Cabin (Washington, Tyne &#038; Wear)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/neas-44ft-training-cabin/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>16 Bay Modular Classrooms (Peacehaven Community School, East Sussex)</title>
		<link>https://buildingsmodular.co.uk/projects/peacehaven-community-school-modular-classrooms/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=peacehaven-community-school-modular-classrooms</link>
					<comments>https://buildingsmodular.co.uk/projects/peacehaven-community-school-modular-classrooms/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 16:05:29 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3854</guid>

					<description><![CDATA[<p>16 Bay Double Storey Modular Classroom (Temporary) Duo Pitched building Location: Peacehaven School, East Sussex Temporary Classrooms for a 2-3...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/peacehaven-community-school-modular-classrooms/">16 Bay Modular Classrooms (Peacehaven Community School, East Sussex)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>16 Bay Double Storey Modular Classroom (Temporary)</p>
<p>Duo Pitched building</p>
<p>Location: Peacehaven School, East Sussex</p>
<p>Temporary Classrooms for a 2-3 year period, but have remained permenant</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-006.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-006.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 187"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-005.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-005.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 188"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-004.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-004.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 189"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-003.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-003.jpg" class="attachment-thumbnail size-thumbnail" alt="16 Bay Modular Temporary Classrooms" title="Projects 190"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-002.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Peacehaven-002.jpg" class="attachment-thumbnail size-thumbnail" alt="Temporary Modular Classrooms" title="Projects 191"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/peacehaven-community-school-modular-classrooms/">16 Bay Modular Classrooms (Peacehaven Community School, East Sussex)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/peacehaven-community-school-modular-classrooms/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>20 Bay Modular Offices &#038; Welfare (Tottenham Hale)</title>
		<link>https://buildingsmodular.co.uk/projects/tottenham-hale-20-bay-modular-offcies-welfare/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tottenham-hale-20-bay-modular-offcies-welfare</link>
					<comments>https://buildingsmodular.co.uk/projects/tottenham-hale-20-bay-modular-offcies-welfare/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 15:45:21 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3828</guid>

					<description><![CDATA[<p>28 bay Modular offices &#38; Welfare facilities, located in Tottenham Hale Challenging project due to location, but designed, manufactured and...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/tottenham-hale-20-bay-modular-offcies-welfare/">20 Bay Modular Offices &#038; Welfare (Tottenham Hale)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>28 bay Modular offices &amp; Welfare facilities, located in Tottenham Hale</p>
<p>Challenging project due to location, but designed, manufactured and installed with 15 weeks</p>
<p>No ventilation system, but full M&amp;E systems nevertheless (Air Conditioning systems via Acrol Air for heating &amp; cooling)</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060480.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060480.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 192"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060479.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060479.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 193"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060474.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060474.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 194"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060472.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060472.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 195"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060471.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060471.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 196"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060469.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060469.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 197"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060467.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060467.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 198"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060465.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060465.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 199"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060464.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060464.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 200"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060449.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060449.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 201"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060450.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060450.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 202"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060455.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060455.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 203"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060456.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060456.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 204"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060457.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060457.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 205"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060458.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060458.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 206"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060459.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060459.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 207"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060461.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060461.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 208"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060462.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060462.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 209"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060448.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060448.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 210"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060447.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060447.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 211"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060446.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060446.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 212"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060445.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060445.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 213"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060444.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-4"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/P1060444.jpg" class="attachment-thumbnail size-thumbnail" alt="28 bay Modular welfare &amp; offices" title="Projects 214"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/tottenham-hale-20-bay-modular-offcies-welfare/">20 Bay Modular Offices &#038; Welfare (Tottenham Hale)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/tottenham-hale-20-bay-modular-offcies-welfare/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>6 bay Modular Sports Changing Facility (Croy, North Lanarkshire)</title>
		<link>https://buildingsmodular.co.uk/projects/croy-north-lanarkshire-modular-spaort-changing-facility/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=croy-north-lanarkshire-modular-spaort-changing-facility</link>
					<comments>https://buildingsmodular.co.uk/projects/croy-north-lanarkshire-modular-spaort-changing-facility/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 15:39:20 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3817</guid>

					<description><![CDATA[<p>6 no bay double modular Sport Changing facility (3 on 3) Location: Croy, North Lanarkshire Apex roof installed onsite adding...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/croy-north-lanarkshire-modular-spaort-changing-facility/">6 bay Modular Sports Changing Facility (Croy, North Lanarkshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>6 no bay double modular Sport Changing facility (3 on 3)</p>
<p>Location: Croy, North Lanarkshire</p>
<p>Apex roof installed onsite adding an additional 2 weeks to the onsite programme</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/photo.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="448" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/photo.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 215"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/croy.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="383" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/croy.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Sports Changing Rooms" title="Projects 216"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-012-2.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-012-2.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 217"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-010-2.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-010-2.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 218"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-009.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-009.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 219"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-008.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-008.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 220"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-006.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-006.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 221"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-004.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-5"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Croy-004.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Sports Changing Rooms" title="Projects 222"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/croy-north-lanarkshire-modular-spaort-changing-facility/">6 bay Modular Sports Changing Facility (Croy, North Lanarkshire)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/croy-north-lanarkshire-modular-spaort-changing-facility/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>32ft Portable Marketing Cabin</title>
		<link>https://buildingsmodular.co.uk/projects/32ft-marketing-cabin/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=32ft-marketing-cabin</link>
					<comments>https://buildingsmodular.co.uk/projects/32ft-marketing-cabin/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 08:11:07 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3795</guid>

					<description><![CDATA[<p>A New 32ft Marketing Portable cabin, with upgraded Wc &#38; Kitchen Available for purchase or Hire, but eventually sold to...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/32ft-marketing-cabin/">32ft Portable Marketing Cabin</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>A New 32ft Marketing Portable cabin, with upgraded Wc &amp; Kitchen</p>
<p>Available for purchase or Hire, but eventually sold to Abbey Plant (Hexham)</p>
<p>Keys Features:</p>
<ol>
<li>Hybrid galvanised steel floor</li>
<li>Boxed fascia</li>
<li>Boxed jack leg covers</li>
<li>Wood effect flooring</li>
<li>Solid oak office glazed partitioning</li>
<li>Upgraded Kitchen, Timber effect</li>
<li>Upgraded WC and vanity unit</li>
<li>Thermowood cladding</li>
<li>LED Downlighting</li>
</ol>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084458.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084458.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 223"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084506.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084506.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 224"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084510.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084510.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 225"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084516.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084516.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 226"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084522.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084522.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 227"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084527.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084527.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 228"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084552.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-6"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/20240725_084552.jpg" class="attachment-thumbnail size-thumbnail" alt="New 32ft marketing Cabin" title="Projects 229"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/32ft-marketing-cabin/">32ft Portable Marketing Cabin</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/32ft-marketing-cabin/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>2 bay Unique Modular Vending Cafe (UR Pit Stop)</title>
		<link>https://buildingsmodular.co.uk/projects/ur-pit-stop-modular-vending-cafe/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=ur-pit-stop-modular-vending-cafe</link>
					<comments>https://buildingsmodular.co.uk/projects/ur-pit-stop-modular-vending-cafe/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 07:29:25 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3782</guid>

					<description><![CDATA[<p>2 bay Modular vending cafe Concept/Prototype Original Location: Melton Mowbray, but now part of Exeter Chiefs marketing and Commercial activities...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/ur-pit-stop-modular-vending-cafe/">2 bay Unique Modular Vending Cafe (UR Pit Stop)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>2 bay Modular vending cafe Concept/Prototype</p>
<p>Original Location: Melton Mowbray, but now part of Exeter Chiefs marketing and Commercial activities</p>
<p>Micro rib cladding externally, with all internal walls skimmed &amp; painted finish, including a sloping internal ceiling</p>
<p>At the time this was prototype modular building and planned to be first UK motorway unmanned cafe</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0011.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0011.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 230"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0010.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0010.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 231"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0009.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0009.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 232"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0006.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0006.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 233"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0005.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0005.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 234"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0003.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="338" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191015-WA0003.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 235"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191009-WA0001.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191009-WA0001.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 236"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191009-WA0000.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191009-WA0000.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 237"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191008-WA0002.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="253" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20191008-WA0002.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 238"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Acrol-Vending-Cafe.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-7"><img loading="lazy" decoding="async" width="600" height="337" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/Acrol-Vending-Cafe.jpg" class="attachment-thumbnail size-thumbnail" alt="Modular Vending Cafe" title="Projects 239"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/ur-pit-stop-modular-vending-cafe/">2 bay Unique Modular Vending Cafe (UR Pit Stop)</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/ur-pit-stop-modular-vending-cafe/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>20ft Portable Marketing Cabin 2018</title>
		<link>https://buildingsmodular.co.uk/projects/20ft-marketing-cabin-2018/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=20ft-marketing-cabin-2018</link>
					<comments>https://buildingsmodular.co.uk/projects/20ft-marketing-cabin-2018/#respond</comments>
		
		<dc:creator><![CDATA[Acrol Office]]></dc:creator>
		<pubDate>Thu, 25 Jul 2024 07:20:25 +0000</pubDate>
				<guid isPermaLink="false">https://buildingsmodular.co.uk/?post_type=projects&#038;p=3775</guid>

					<description><![CDATA[<p>1st ever portable marketing Cabin manufactured and delivered 100% Western Red Cedar cladding, boxed fascia and jack leg covers, with...</p>
<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/20ft-marketing-cabin-2018/">20ft Portable Marketing Cabin 2018</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></description>
										<content:encoded><![CDATA[<p>1st ever portable marketing Cabin manufactured and delivered</p>
<p>100% Western Red Cedar cladding, boxed fascia and jack leg covers, with wood effect flooring</p>
<p>Open plan only.</p>

<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0006.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-8"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0006.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 240"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0005.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-8"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0005.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 241"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0004.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-8"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0004.jpg" class="attachment-thumbnail size-thumbnail" alt="" title="Projects 242"></a>
<a href='https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0003-Wester-Red-cedar.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-8"><img loading="lazy" decoding="async" width="600" height="450" src="https://buildingsmodular.co.uk/wp-content/uploads/2024/07/IMG-20190807-WA0003-Wester-Red-cedar.jpg" class="attachment-thumbnail size-thumbnail" alt="24ft Jack Leg Marketing Cabin" title="Projects 243"></a>

<p>&lt;p&gt;The post <a rel="nofollow" href="https://buildingsmodular.co.uk/projects/20ft-marketing-cabin-2018/">20ft Portable Marketing Cabin 2018</a> first appeared on <a rel="nofollow" href="https://buildingsmodular.co.uk">Acrol Modular Buildings</a>.&lt;/p&gt;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://buildingsmodular.co.uk/projects/20ft-marketing-cabin-2018/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
